" "

St. Project Scheduler (Tool Install)

Manassa, VA 20110

Posted: 12/18/2023 Job Number: 28243

Job Description

We are seeking a highly skilled and experienced Senior Project Scheduler specializing in Tool Install projects within the semiconductor industry. The ideal candidate will have a Bachelor of Science (B.S.) Degree in Industrial Engineering or a related engineering/technical field, along with significant experience in scheduling large, complex industrial projects. PMI Scheduling Professional (PMI-SP)® Certification and proficiency in Primavera P6 scheduling are mandatory. This is a 1-year contract position with the potential for extension, offering an hourly range of $45/hr. - $70/hr.

Qualifications:
  • Bachelor of Science (B.S.) Degree in Industrial Engineering or related engineering/technical field or an associate degree (Military Equivalent) in a technical field with 4+ years of semiconductor industry experience.
  • PMI Scheduling Professional (PMI-SP)® Certification.
  • 8+ years of experience scheduling for large, complex industrial projects.
  • 4+ years of experience scheduling Tool Install projects.
  • Proficiency in Primavera P6 scheduling.
  • Knowledge of Excel, VBA, Power BI, and Access for reporting and analysis.
Responsibilities:
  • Act as a Liaison between project team members and the client team Scheduler/ing system, ensuring accurate conveyance and assembly of information per the Tool Install schedule.
  • Support scheduling conflict resolution internally and externally, escalating when necessary.
  • Manage daily scheduling activities of the project team, ensuring performance and productivity meet established models.
  • Perform time impact analyses (TIA) to determine potential delays' extent and provide recommendations for schedule recovery.
  • Conduct recovery schedule reviews and perform what-if scenario analysis. Assess and recommend solutions for schedule, scope changes, or delays to the Project Team and Executive Management.
  • Establish baseline schedule, including summary and detailed reviews of durations, logic, resources, costs, cost curves, and resource histograms.
  • Conduct schedule workshops, identifying critical path activities and guiding teams to follow generally accepted Agile/Scrum practices.
  • Understand and promote LEAN philosophy for effective implementation in the design/construction industry.
Hourly Range:
  • $45/hr. - $70/hr.
Shift and Hours:
 
  • Monday to Friday
  • 8 am - 5 pm
Type of Job:
  • 1-year contract
Contact Information:
If you are interested in learning more about this opportunity, please contact Jaie Rogers at jrogers@selectek.com or call 678-802-6632.
 

Meet Your Recruiter

Jaie Rogers
Technical Recruiter

Hi, my name is Jaie Rogers and I am a native of Honduras.  My family moved to Bronx, NY when I was two years old and in 2003 I made the move to the Atlanta, GA area where I currently reside.  I started my career in recruiting and staffing in 2010.  My background consists of recruiting for various positions in the medical field, call-centers, property management, industrial manufacturing plants, along with engineering and technical roles.  The most exciting part of my job is talking to a variety of people every day and getting to know them.  The most filling part is being a career matchmaker for both my client and the candidates.

In my free time, I enjoy reading, sewing, thrifting, playing sports, and spending time with my family.

I do not like to quit or give up, so you will always be in the best hands when it comes to finding the top career opportunities.

Send an email reminder to:

Share This Job:

Related Jobs:

Login to save this search and get notified of similar positions.

Get started today

Clients
Candidates

Looking for the highest qualified professionals in the engineering and technology fields? We ll help you find the right people you want faster.

We ll place you with companies that need your exact expertise and experience and that appreciate you coming to work with them.

Email Us

Please fill out this form and we will get in touch with you shortly.

  • This field is for validation purposes and should be left unchanged.

Selectek, Inc.
2015 Vaughn Road
Suite 130
Kennesaw, GA 30144
Directions